School District of Bloomer

Bloomer, Wisconsin

Site Civil and Landscape Architecture for Elementary School

Rettler Corporation provided full site design services for the new 101,000 S.F. elementary school. Design services consisted of developing comprehensive storm water management facilities for the entire school district campus including roadway, building, and green space areas. Rettler Corporation also provided utility design connections to the school facility, parking, drives, athletic fields, and other site features. The fast track project schedule required beginning the design process in November 2012 and project opening on August 2013.

90 Acre Campus Master Plan

Rettler Corporation developed a comprehensive site Master Plan for the entire community education center. The master plan included the redevelopment of the existing middle school, the addition of new high school and new elementary school buildings, and the construction of new municipal roadways and utilities, including school site amenities such as athletic fields. This information was presented to the public in support of a new elementary school referendum. The referendum passed in 2011.

1.2 Miles of Municipal Roadway Engineering

Rettler Corporation provided engineering and design for proposed city roadway corridor including utilities, road section, alignment, construction layout, and restoration.