Ledgeview Park

Ledgeview, Wisconsin

Rettler Corporation services for this project included survey, master planning, design, permitting, bid administration, and construction observation and layout. The project design elements included a comprehensive path system to connect to Brown County Trail, trail length of approximately 6,000 lineal feet, 10′ wide bituminous multi-use path system, two (2) 140 free span bridges across the East River Park Shelter – Masonry structure, metal roof and fascia open picnic area, restrooms and storage, 200′ little league baseball field, masonry dugouts that match the main shelter, award space with benches and flagpole, parking for 43 cars, decorative fencing and lighting, community and park sign at entrance of park, landscaping and irrigation throughout the project, and storm water management facilities.