School District of Alma Center-Humbird-Merrillan
Alma Center, WI
Completed as part of a 2021 referendum, this track and field stadium redevelopment included a new 8 lane running track as well as new jumping and throwing events. The redeveloped natural turf sodded football field included irrigation and underdrain improvements. This project included an enclosed 500 seat grandstand, press box, LED athletic field lighting, scoreboard, sound system, and a new concessions/restroom building. The decorative concrete plaza includes an overhead entry feature and donor recognition. Additionally, the baseball outfield was topdressed and improved. Rettler Corporation assisted the school district with the referendum process from planning through construction.
Scope of Services: Planning, Site Design, Engineering, Permitting, Construction Observation
Budget: $3,900,000
Completion: 2022