top of page

Keil High School

Kiel, WI
Design and construction management for an athletic complex in Kiel, Wisconsin included the following:
  • Synthetic surface football/soccer field with shock pad

  • Plaza with new concession building including restrooms and family restroom 

  • Recognition paver walk, 50 feet long by 4 feet wide

  • Grandstand with 1,000 seats, press box and 3,592 square feet full enclosure storage system with rollup doors

  • Ticket booth with decorative gate entries

  • Reconstructed 8 lane / 9 sprint lane track, pole vault, high jump, long jump/triple jump with polyurethane track surfacing

  • LED stadium lights

  • Construction started May 15, 2019 and was completed August 12, 2019.

DJI_0171.jpg
bottom of page